>Super Yacht hotel project delayed in London

Share Button

>The Super Yacht hotel due to open in London, is on hold owing to the economic crisis
Aquiva, the 170 meter long super yacht-hotel, is permanently anchored at London’s Docklands and is to be converted into a hotel. Featuring 158 rooms and suites, an on-board ballroom, a spa, gym, pool, and a celebrity chef restaurant and bar it is to be a contemporary luxury hotel.

Read more:
http://www.worldinteriordesignnetwork.com/news/super_yacht_hotel_project_delayed_in_london_090629

About the Author